Welcome to the Online Help
How to Use Online Help
U2000 Web LCT V100R003C00 Overview
Getting Started
Security Management
Creating and Configuring NEs
Time Localization Management
Managing NG WDM NA NEs
    WDM Network Management Process
    DCN Management
    Configuring the NE Time
    Configuring WDM Protection
    Configuring Board Parameters
    Configuring the Working Mode of the Board
       About the Working Modes
       Configuration Rules
       Configuring the Working Mode of the 52TOM Board
       Configuring the Service Mode
       Configuring the Service Type
       GUI Description: Working Mode
       Application Scenario 1: Realizes the Conversion Between Eight Any Services and Two ODU0 or One ODU1 Electrical Signals
       Application Scenario 2: Realizes the Conversion Between Six Any Services and One OTU1 Optical Signal (with ODU0 mapping)
       Application Scenario 3: Realizes the Conversion Between Eight Any Services and One ODU1 Electrical Signal
       Application Scenario 4: Realizes the Conversion Between Six Any Services and One OTU1 Optical Signal (with ODU1 mapping)
       Application Scenario 5: Realizes the Conversion Between Eight Any Services and Eight ODU0 or Four ODU1 Electrical Signals
       Application Scenario 6: Realizes the Conversion Between Six Any Services and Two OTU1 Optical Signals
       Application Scenario 7: Realizes the Conversion Between Eight Any or Four OTU1 Services and Four ODU1 Electrical Signals
       Application Scenario 8: Realizes the Conversion Between Four OTU1 Services and Eight ODU0 Electrical Signals
       Application Scenario 9: Realizes the Conversion Between Four OTU1 Optical Signals and Eight ODU0 Electrical Signals (Through Any Re-Encapsulation)
       Application Scenario 10: Realizes the Conversion Between Four OTU1 Optical Signals and Four ODU1 Electrical Signals (Through Any Re-Encapsulation)
       Application Scenario 11: Realizes the Conversion Between Four OTU1 Optical Signals and Four OTU1 Optical Signals (Through Any Re-Encapsulation)
       Application Scenario 12: Realizes the Regeneration of Four OTU1 Optical Signals
          Configuration Networking Diagram
          Service Signal Flow
          Configuration Process
    Configuring Optical Cross-Connections
    Configuring WDM Services
    OTN Overheads
    Configuring Ethernet Services
    QoS(WDM/SDH Networks)
    MC-LAG(WDM Network)
    LAG (WDM Network)
    ETH-OAM
    IGMP Snooping
    STP and RSTP(WDM Network)
    Test Frame
    Managing the Optical Power
    Configuring ROADM
    IPA
    Configuring PRBS Test
    Common Maintenance Operations
Managing WDM ASON Networks
Alarm Management
Performance Management
Viewing Reports
GUI Reference
Appendix
Technical Support