Configuring PM Overheads

This section describes how to configure the path monitoring (PM) overheads.

Prerequisites

The corresponding OTU must be configured.

Procedure

  1. In the NE Explorer, select an OTU board and choose Configuration > OTN > PM Overhead from the Function Tree.
  2. Click Query at the right bottom of the interface and query the configuration of the current corresponding overhead.



  3. Optional: Select the unit port or channel. Click State > OOS to set the Primary, Secondary State.
  4. Double-click the fields TIM Mode, and select a new value.

    NOTICE:
    Configuring the parameter LCK Insertion as ENABLE may interrupt service.
    NOTE:

    For details about operation differences between the standard and compatibility modes, see the Impacts of the Standard Mode on the U2000 Web LCT.

  5. Double-click the parameter fields to set the parameters.
  6. Click Apply and the configuration is complete.
  7. Optional: Select the unit port or channel. Click State > IS to set the Primary, Secondary State.

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.