Checking 1+1 Board Switching Status

If board 1+1 protection switching is triggered, the protected board has failed. The network maintenance engineers can check 1+1 board switching status to detect the faults that caused the failure.

Prerequisites

The protection board must be created.

Procedure

  1. In the NE Explorer, select an NE and choose Configuration > Board 1+1 Protection from the Function Tree.
  2. Click Query to query the 1+1 board switching status.
  3. Click Close.

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.