This topic describes the testing procedure for the DLAG protection switching that is triggered by the line failure after the fiber is removed.
Prerequisites
A DLAG protection group must be configured at station A.
The fiber connections between station A and station B must be complete.
The equipment must be running normally.
Tools, Equipment and Materials
U2000 Web LCT, SmartBits (SMB), optical fiber, flange
Test Connection Diagram
Figure 1 and Figure 2 show the DLAG protection in the normal and switching states.
Figure 1 DLAG protection (normal)
Figure 2 DLAG protection (switching)
Procedure
- Connecting Test Instruments
- Connect a SmartBits (SMB). See Figure 1. Make P2 send data packets and P1 receive the data packets.
- Querying the Normal Channel Status of station A, as shown in Figure 1
- Log in to the U2000 Web LCT. Double-click NE A in the Main Topology, and the status figure of NE A is displayed.
- Right-click a NE icon and select NE Explorer to display the NE Explorer dialog box.
- Select the NE from the Navigator Tree in the left-hand pane and choose from the Function Tree.
- Click Query. A prompt appears to indicate that the operation was successful. Click Close. In this case, Main Board is TBE1, and Slave
Board is TBE2.
- Querying the Protection Switching Channel Status of Station A.
- Remove the fiber in the RX1/TX1 optical interface of the TBE1 board in station A to perform the switching, as shown in Figure 2.
- In the NE Explorer dialog box, select the NE from the Navigator Tree in the left-hand pane and choose from the Function Tree.
- Click Query. A prompt appears to indicate that the operation was successful. Click Close. In this case, Main Board is TBE2, and Slave
Board is TBE1.
- Reconnect the fiber into the RX1/TX1 optical interface of TBE1 board in station A.
- Switching time calculation: Switching time = (Packets sent by P2 - Packets received at P1)/Packet sending speed. The protection switching time must be smaller than 100 ms.
Copyright © Huawei Technologies Co., Ltd.