Verifying Intra-Board 1+1 Protection Switching

This section takes a network formed by two OTM stations as an example to describe the test procedure of the intra-board 1+1 protection switching that is implemented by using the OLP.

Prerequisites

The intra-board 1+1 protection must be configured.

The fiber connections between station A and station B must be complete.

The equipment must be running normally.

Tools, Equipment and Materials

U2000 Web LCT, signal analyzer, optical fiber, flange, optical attenuator

Set-up Diagram

The diagram of testing intra-board 1+1 protection switching is shown in Figure 1.

Figure 1 Testing intra-board 1+1 protection switching

: Fixed optical attenuator

Procedure