Verifying Optical Line Protection Switching

This section takes a ring network formed by two OTM stations to describe the test procedure of the optical line protection switching.

Prerequisites

The optical line protection must be configured

The fiber connections between station A and station B must be complete.

The equipment must be running normally.

Tools, Equipment and Materials

U2000 Web LCT, signal analyzer, optical fiber, flange, optical attenuator

Set-up Diagram

The diagram of testing optical line protection switching is shown in Figure 1.

Figure 1 Testing the optical line protection

: Fixed optical attenuator

Procedure


Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.