Configuration Process

The configuration in this example can be completed in a one-touch manner after the GE/OC3 hybrid transmission service package is executed.

Background Information

When the service of another type needs to be added through any one of optical interfaces 3-6 of the LQM2, re-configure the interface in the common mode; otherwise, the service is not available.

Precautions

NOTICE:

When the service package is started, the configuration that supported service package boards on the NE is cleared first and then the service package is started.

Procedure

  1. Configuring the add services at station A
    1. Select Configuration > CAM Configuration from the Function Tree.
    2. Click Query.
    3. Select the GETH/OC3 hybrid service package and click Configure.
    4. Click Close on the Operation Result dialog box. Then, click OK on the Confirm dialog box to perform uploading.
    5. Click Close on the Operation Result dialog box. Then, the GE/OC hybrid service package is configured on NE



      NOTE:

      CAM ID: Each service package is assigned with one ID, which cannot be changed.

      Detail: Indicates the type of the service package.

  2. Configuring the drop services at station B
    1. Select Configuration > CAM Configuration from the Function Tree.
    2. Click Query. Then, click Close on the Operation Result dialog box.
    3. Select the GETH/OC3 hybrid service package and click Configure.
    4. Click Close on the Operation Result dialog box. Then, click OK on the Confirm dialog box to perform uploading.
    5. Click Close on the Operation Result dialog box. Then, the GE/OC hybrid service package is configured on NE
  3. Optional: After service packages are configured completely, choose Configuration > Electrical Cross-Connection Service Management from the Function Tree.
  4. Optional: Click Query can query the services that configured.