Configuration Process

This section describes how to configure the GE service on NEs A and B. This section describes only the configuration in one direction. The configuration in the other direction is similar.

Precautions

NOTICE:

When configuring the cross-connect services, ensure that the WDM-side optical path number used at the transmit end is consistent with that at the receive end of a service in the same direction. Otherwise, the service cannot be available.

Procedure

  1. When configuring the add and drop services, first select the desired board and choose Configuration > WDM Interface from the Function Tree to configure the service type of the WDM interface of the OTU. For detailed configuration method, see Configuring the Service Type.
  2. Configure the add service on NE A.
    1. In the NE Explorer, select an NE and choose Configuration > Electrical Cross-Connection Service Management from the Function Tree.
    2. In the Electrical Cross-Connection Configuration tab page, click New to display the Create Cross-Connection Service dialog box.
    3. In the Create Cross-Connection Service dialog box, select proper values for Service Level and Service Type according to the planning.



    4. Click OK, and thus one cross-connect service route is created.
  3. Configure the drop service on NE B.
    1. In the NE Explorer, select an NE and choose Configuration > Electrical Cross-Connection Service Management from the Function Tree.
    2. In the Electrical Cross-Connection Configuration tab page, click New to display the Create Cross-Connection Service dialog box.
    3. In the Create Cross-Connection Service dialog box, select proper values for Service Level and Service Type according to the planning.



    4. Click OK, and thus one cross-connect service route is created.

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.