During routine maintenance, you need to know the resource utilizations of TE links. First, check the number of TE links in the entire network. Then, check the remaining resources of each TE link. The number of TE links should be consistent with the number of TE links that are used. The remaining resources of the TE links on two adjacent nodes on one fiber should be the same.