Figure 1 shows a transmission network that is comprised of both OptiX equipment and the third-party equipment that supports the OSI over DCC feature. The steps to plan the DCN are as follows:
Plan network areas according to the situation of the network.
Considering the number of the NEs, divide the entire DCN into three areas to make the number of the NEs in each area smaller than 32. In addition, set the four NEs on the central ring as L2 NEs to ensure that each area has an L2 NE and the L2 NEs are consecutive.

Select the gateway NE.
Select NE101, NE201, and NE301 as the gateway NEs to manage the OptiX NEs in their own areas.
Plan DCCs.