The copper services are seldom used. Generally, temporary services, such as the abrupt services in holidays, are configured as copper services.The copper WDM ASON trails are classified into OCh trail, ODU0 trail, ODU1 trail, ODU2 trail, ODU3 trail and ODU4 trails .
Copper services are also called non-protection services. If an LSP fails, services do not reroute and are interrupted. Table 1 lists the attributes of copper services.
Attribute |
Silver Service |
|---|---|
Requirements for creation |
Sufficient non-protection resources are available between the source node and the sink node. |
Service restoration |
Does not support rerouting. |
Rerouting |
NOTE:
USP V100R005 support the priority and cranback times. Copper electrical-layer WDM ASON trail does not support the priority. |
Service upgrade and downgrade |
|
Service migration |
|
Service optimization |
Supports manual service optimization. |
Service association |
Supports service association. |