Commissioning Networks
Before configuring services for NEs, users need to commission
networks for the NEs to communicate with others.
- Testing the Connectivity of IF Cables
By testing intermediate frequency (IF) cables, you can detect and locate faults on microwave equipment hardware. This helps improve the efficiency of fault diagnosis, and equipment installation and maintenance.
- Configuring SNMP Communication Parameters
By setting SNMP communication parameters, you can enable the SNMP server to monitor alarms and performance events on an NE.
- Testing the Fade Margin
This topic describes how to test the fade margin. The fade margin is also an item in the hardware acceptance test of a project. After the hardware is installed and single-hop microwave links are commissioned, the fade margin is tested to check the deviation between the actual value and the theoretical value in network planning.
- Performing the Acceptance of NE Functions
You can generate the acceptance report of an NE by using the one-touch test function. According to the report, you can quickly learn the running status of the NE.