Configuration Procedure (IP over DCN Solution)

Configuring the IP over DCN solution includes configuring communication data at the near end and creating NEs on the NMS.

Configuration Flowchart

Figure 1 Flowchart for configuring the IP over DCN solution

Configuration Procedure

Table 1 Procedure for configuring the IP over DCN solution
Step Operation Description
1 Modifying an NE ID

Required.

2 Setting NE Communication Parameters

Required, when configuring communication, set the parameters including IP, subnet mask, gateway IP, extended ID, and connection mode for the NE.

3 Configuring the IP Static Route for an NE

Required, a static route forwards the data between NEs, or between a router and the computer where the U2000 Web LCT is installed.

4 Customizing Communication Channels Between NEs

Required.

5 Configuring Extended ECC Communication

Required, you can establish extended ECC communication between two subracks without fiber connections through an Ethernet line. In this way, the U2000 Web LCT manages the equipment in a centralized manner..

6 Viewing the Communication Status of DCC Channel

Required.

7 Configure multiple OSPF areas

Required for an ABR.

8 Configuring Proxy ARP

Optional.


Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.